DETAILS FOR SPECIFICATION
Structure  
Reinforced Cement Concrete framed structure
Roof  
Reinforced Cement Concrete roof with weathering course. High Quality pressed tiles for terrace.
Walls  

9 inch Brick work for outer walls and 4.5 inch thick brick work for internal panel walls.

Doors  
Main doors will be of Teak wood Frame with ready made Panel door. Other doors with Contry wooden frame with water proof doors with Enamel paints.
Windows  
Good Quality of Country wood Frames shutters with glazing and M.S.Grills
Kitchen  
Stainless Steel sink and Polished Granite top for Kitchen Platform .
Wall Tiles  
Kitchen Glazed tiles to a height of 2 ft( Two feet over the counter) Toilet Glazed tiles to a height of seven feet.
Flooring  
Inner Carpet area will be provided with 24* 24 Vitrified tiles (Cost- 40 Rs / sft).
Ward Robe  
Each bedroom and Kitchen with one loft at any one side of the room.
Ward Robe / Cup Board in all bed rooms. Kitchen with Cuddapah slabs without shutters.
Locks  
Main Doors to have a Godrej Lock with safety chains and magic eye. All other bedrooms doors has lock with handle.
Sanitary Fittings  
One Water Closet of Orrisa pan in common toilet
Two Wash Basin’s size 16*22 in common toilet and in Dining( PARRYWARE/JOHNSON )
Taps & shower heads are in each toilet
EWC at toilet in Bedroom with high level flush tank ( PARRYWARE/ JOHNSON)
Paintings  
Birla wall care putty with Asian Ace Interior Paints Emulsion for inner walls
Weather proof paint for all Exterior walls.
Electrical  
Two Fan points, Two Light points and three 5Amps plug socket provided in Living and Dining.
5 Amps Socket near Bed Head in all Bed rooms. Four 5 Amps plug Socket and two 15 Amps plug Socket provided in the Kitchen.
One 15 Amps plug Socket point and one 5 Amps and One Exhaust fan point provided in the toilets.
AC points provided in all Bed rooms. Telephone points, Cable, T.V points will be provided in Living and Master Bed room.
All switches and sockets are of Elles modular
Three Phase power supply with Independent Meter. (Extra )
PAYMENT SCHEDULE
While Agreement time
15%
While basement completion
25%
while Completion of brick work
20%
while respective Roof completion
20%
While hand over
15%
While hand over
5%
TOTAL COST
100%
 
Material Contract Projects
 
   
  ASMA Building
.........................................................
  Meerlan Tower
........................................................
  Jayaram Apartments
.........................................................
  Rabiya Complex
.........................................................
  HCL Building


 

 

 

 

Home | About Us | Current Products| Completed Products | View Gallery | Contact Us

© Copyrights 2010 Sundrammfoundation.Com. All right reserved.